Follow-up process Shipment Entry IHS Assignment

With this dialog, which is used in several modules, it is possible to assign modules, it is possible to assign services to the underlying entity. underlying entity. This means that if the dialog is in the person management, the assignment of services for the selected person for the selected person, the same when the dialog is on the customer/cost center management, the assignment is made for the selected cost center or selected cost center or customer. The assignments can be made for different services and they can be time limited.

IHS shipments to persons or customers/cost centers for which a subsequent process Shipment entry IHS is defined are routed to the logistics unit for temporary storage (or its district) when they are entry in the MS/OS-IHS modules, they are routed to the logistics unit for temporary storage of shipments (or their carrier route).
The definition of this logistics unit is made in the Global Settings Sorting Systems (Settings / Production / Workstations / Global settings).

View

The dialog is filled by a list with the recorded assignments to the underlying entity. The entries are displayed in such a way that one entry is displayed in the list for each assignment with all the services defined for it. with the same valid-to date are displayed in the list. The services are displayed in the "Service(s)" column separated by semicolons. The buttons with the available functions are located on the right side of the list.

Operation

  • Add
    A new assignment is created. A new detail dialog is opened for this purpose.

  • Edit
    Edit an existing assignment. To do this, first select an assignment from the list. You can also execute this function directly by double-click on an assignment in the list.

  • Delete
    Deletes an existing assignment. To do this, first select an assignment from the list. Before the assignment is finally deleted, a confirmation prompt appears.

Currently valid subsequent process Shipment entry IHS assignment

There is only one valid allocation per day and service. For the determination of the current allocation the following criteria apply: (and in this order)

  • 1: If an assignment exists for the corresponding service for the current date, it is taken over. for the current date exists for the corresponding service, this is transferred.

  • 2. if this is not the case, the assignment will be is transferred with the <All services> service for the current date.

  • If there are several assignments for the current date, the following applies the following applies: Logic for determining the current record based on the validity area.



CodX Software CodX Software AG
Sinserstrasse 47
6330 Cham
Switzerland
Support
http://support.codx.ch
CxSpickel