Logic for determining the current data record
based on the validity area
In several locations in CodX PostOffice, you can
assignments can be made for a specific duration.
The logic for determining the valid
data record is explained using the three data records with different
effectivity areas. (see
figure)
If several
validity areas exist for the current day, the following
sequence for determining the currently valid data record.
-
1. the data record with the shortest date range
date range (in the above example, these are the records with 9
days)
-
2. the record whose start date is closer to the current day
to the current day(in the above example, this is the
record with 2 days)
-
If the date range is the same, it is undetermined which record is selected.
is undefined, which data set is selected.
|
 |